Sunday, October 7, 2018

C-CHANNEL COMPLETE

Over the last couple of weeks we have finished the subfloor epoxy coating and installation. The DIY sheet metal brake that Tim constructed several months ago was finally pressed into service with all of the required C-channel being bent. The C-channel runs the perimeter of the subfloor decking and is used to attach the wall ribs and both the exterior and interior walls to it. This weekend Tim was able to install the final sections of C-channel onto the subfloor. This upcoming week we hope to drop the axle and flip the frame to begin installation of the holding tanks, insulation and belly pans. Of course this will depend on Tropical Storm/Hurricane Michaels track. 