Monday, September 10, 2018

SUBFLOOR CUT ...

We have finally completed cutting the subfloor pieces this weekend and have begun to drill all of the panels for the elevator bolt and screws. We are going to do a temporary install of the subfloor and then remove it from the frame to be throughly coated with penetrating epoxy to help prevent future damage from any leaks that we may experience in the future. This will allow us to epoxy the bolt and screw holes as an added precaution. 

Safe Travels !!
Tim

Click image for larger version

Name:	544AAAE7-2D96-40D9-9A4C-70DFFB218239.jpg
Views:	12
Size:	364.7 KB
ID:	322068

Click image for larger version

Name:	DB484C71-F18D-4156-BE42-389250E4D93D.jpg
Views:	11
Size:	361.9 KB
ID:	322069

No comments:

Post a Comment

D12 - 05/10/24 WHAT?! WAIT. SNOW!

  By mid morning Tim and I departed Absarokee, MT continuing west through Livingston to Belgrade, MT. We are here staying with my sister JoA...