Monday, September 10, 2018

SUBFLOOR CUT ...

We have finally completed cutting the subfloor pieces this weekend and have begun to drill all of the panels for the elevator bolt and screws. We are going to do a temporary install of the subfloor and then remove it from the frame to be throughly coated with penetrating epoxy to help prevent future damage from any leaks that we may experience in the future. This will allow us to epoxy the bolt and screw holes as an added precaution. 

Safe Travels !!
Tim

Click image for larger version

Name:	544AAAE7-2D96-40D9-9A4C-70DFFB218239.jpg
Views:	12
Size:	364.7 KB
ID:	322068

Click image for larger version

Name:	DB484C71-F18D-4156-BE42-389250E4D93D.jpg
Views:	11
Size:	361.9 KB
ID:	322069

WHEEL WELLS COMPLETE

We have had the Liner for three years waiting for me to retire and dedicate my time to it. It is nice having the time to work on it and be able to not rush to a stopping point with anticipation of going to work.  

The wheel wells
 are completed. The next step is installing the subfloor as weather permits. We were counting on our usual dry season this spring but that didn’t happen and have been contending with daily thunderstorms and rain. We have had about 45” so far this year. I think daily about how nice it would be to have a garage large enough to work in and not have to stop work because of rain. Maybe on the next one!

Safe Travels!!
Tim
Attached Thumbnails
Click image for larger version

Name:	EA38218C-D733-4663-B9F5-5A0DDA720415.jpg
Views:	22
Size:	340.7 KB
ID:	318270   Click image for larger version

Name:	A1A5E1B2-BCFE-4B29-BC1A-38062E0236F0.jpg
Views:	23
Size:	491.3 KB
ID:	318272  

11/10/2024 - EPIC ADVENTURE UPDATE AND STATISTICS

Scroll down. Details below… Here we are! Can not believe that we have been home now for a month. This was not the best return we had hoped f...