Saturday, October 13, 2018

BELLY UP!!!

Today was kind of exciting! In preparation for an easier install of the holding tanks, plumbing, insulation and a new belly pan Tim and I flipped the frame today. The process was easier than I anticipated and no one got hurt.  

Click image for larger version

Name:	DA696524-8132-418B-8F31-1B1B00424BE9.jpg
Views:	0
Size:	637.3 KB
ID:	325132

Click image for larger version

Name:	A3389755-A061-4612-A6E3-080AACB0BFF0.jpg
Views:	0
Size:	480.7 KB
ID:	325133

Click image for larger version

Name:	26D55D35-619C-4258-8C5E-37B1BB8FD920.jpg
Views:	0
Size:	492.6 KB
ID:	325134

Click image for larger version

Name:	B07FEF65-9F49-4970-B1FD-EC8FC80D36BE.jpg
Views:	0
Size:	536.6 KB
ID:	325135
__________________

Sunday, October 7, 2018

C-CHANNEL COMPLETE

Over the last couple of weeks we have finished the subfloor epoxy coating and installation. The DIY sheet metal brake that Tim constructed several months ago was finally pressed into service with all of the required C-channel being bent. The C-channel runs the perimeter of the subfloor decking and is used to attach the wall ribs and both the exterior and interior walls to it. This weekend Tim was able to install the final sections of C-channel onto the subfloor. This upcoming week we hope to drop the axle and flip the frame to begin installation of the holding tanks, insulation and belly pans. Of course this will depend on Tropical Storm/Hurricane Michaels track. 


11/10/2024 - EPIC ADVENTURE UPDATE AND STATISTICS

Scroll down. Details below… Here we are! Can not believe that we have been home now for a month. This was not the best return we had hoped f...